Grain Bin and Elevator Construction

Anton Bayer Millwright uses the Bainter hydraulic jacking system to erect their
grain bin construction projects.  We start by constructing the bin roof with a
rolling scaffold/jacking system, once that is completed we then install the
hydraulic jacks and begin raising the grain bin, 32" at a time, installing rings and
stiffeners with each lift and re-set.  Once the bin is completely erected, we then
anchor it down using a epoxy anchoring system.  This anchoring system far
exceeds the structural requirements for wind load and grain pressure.  The bin
unloading auger, aeration fan, and perforated floor is then installed.  Once this is
complete, the grain bin can be immediately filled with whatever grain product it is
purposed for.  
Hopper bottom tanks have a slightly different construction procedure but the
basic principle remains the same with the exception of a crane being used to set
the tank on the hopper bottom and super structure.